Products Categories
  • Ms.Phuong Tram
    Tel: 84-919-568318

  • Mobile:
  • Tel:84-919-568318
  • Fax:84-985-
  • Province/state:Ho Chin Minh
  • City:Ho Chi Minh
  • Street:224/5 Highway 13, Ward 26, Binh Thanh District, Ho Chi Minh City, Vietnam
  • MaxCard:
Home > Products >  Pumping pack ( Polyacrylamide(PAM) )

Pumping pack ( Polyacrylamide(PAM) ) CAS NO.9003-05-8

  • FOB Price: USD: 15.00-15.00 /Kilogram Get Latest Price
  • Min.Order: 200 Kilogram
  • Payment Terms: L/C,D/A,D/P,T/T,Other
  • Available Specifications:

    1(1-200)Kilogram

  • Product Details

Keywords

  • concrete construction
  • pumping pack
  • pumpping aid

Quick Details

  • ProName: Pumping pack ( Polyacrylamide(PAM) )
  • CasNo: 9003-05-8
  • Appearance: white powder, mild odor
  • Application: 9003-05-8 Pumping Pack: Concrete Pum...
  • ProductionCapacity: 500 Metric Ton/Month
  • Purity: 100 %
  • Storage: 200g/pack, 50pack/Box
  • LimitNum: 200 Kilogram
  • Grade: Other

Superiority

General Information

-      Mortar has been used to enhance the lubrication of concrete pump at initial placement of concrete. However, when mortar is used, the compressive strength of concrete decreases and waste is produced.

Such problems can be easily solved by using Pumping-pack.

-      Pumping-pack reduces the line pressure and it increases the Pumping efficiency of concrete pump.

-      Pumping-pack contains no harmful substances, therefore it is environmentally safe.

    -  Pumping-pack shows no negative effects on the properties of concrete.

 

Advantage of Pumping-pack

   Pumping-pack is Economical

-      Easy to use

-      Easily dissolved within 5 minutes

-      Easily put into pumping instrument

-      Environmentally safe(it doesn’t contain heavy metals) compatible with all conventional concrete mixtures

Pumping-pack enables to place low slump concrete by lowering the pipe pressure

 

Details

Usage

1.     Mix Pumping-pack(200g) and water in a 20 liter bucket.

2.     Stir with rod to dissolve Pumping-pack completely.

3.     Solution will become sticky within 3~5 minutes.

4.     Put dissolved Pumping-pack solution into the hopper of pump car.

5.     Dispose of Pumping-pack solution

6.     Put concrete into the hopper of pump car and transfer concrete.

 

Other products of this supplier

lookchemhot product CAS New CAS Cas Database Article Data Chemical Catalog